DefinePK

DefinePK hosts the largest index of Pakistani journals, research articles, news headlines, and videos. It also offers chapter-level book search.

Steel Cutting Ceremony of 16 T Bollard Pull Pusher Tugs being built for Pakistan Navy


Video content is provided via the YouTube platform. All rights and ownership belong to the original content creator.
Source channel: Pakistan Navy

▶ Watch on YouTube
Description

Steel Cutting Ceremony of 16 T Bollard Pull Pusher Tugs being built for Pakistan Navy, was held at Karachi Shipyard & Engineering Works (KS&EW) on 10 Oct, 2019. Vice Admiral Muhammad Fayyaz Gilani HI(M), Commander Coast graced the occasion as Chief Guest. The ceremony was attended by high ranking officials from Government of Pakistan, Pakistan Navy, Corporate Sector and KS&EW.

The Tug has an overall length of 21 meters with a displacement of 255 tons. It has maximum speed of 10 knots and propelled by 2 x Diesel Engines. It is fitted with a very robust fendering arrangement for all round tugging operations. It has also a unique fendering below waterline to ensure safe movements of submarines.

On the occasion, the Honorable Chief Guest said that it is indeed a loud manifestation of indigenization policy being pursued by MoDP. He appreciated Karachi Shipyard for their valuable contribution towards attaining goal of self-reliance in the field of ship building. He highlighted an important segment of marine industry i.e. fishing industry and said that KS&EW has full capacity to construct modern fishing trawlers / boats and urged provincial governments to revamp this area through potential of this solitary shipyard of the country. .

Earlier MD KS&EW, Rear Admiral Ather Saleem SI(M) in his welcome address thanked Pakistan Navy and MoDP for their continued support. He said that in the past KS&EW has already constructed various tugs ranging from 10 to 40 Tons Bollard Pull capacities. He highlighted that in parallel to the Ship Repair and Gen. Engineering activities, various shipbuilding projects including 1500 Tons Maritime Patrol Vessel for Pakistan Maritime Security Agency, Fast Attack Craft (Missile) No. 4 for PN and Bridge Erection Boats for Pakistan Army are being executed. Preparation of mega projects of construction of 4 x submarines and 2 x MILGEM Class Corvettes for PN are being made. He assured that KS&EW is committed to complete these challenging projects on time, meeting international quality standards.

Facebook Post : http://bit.do/fcoib
Twitter Post : http://bit.do/fcohx
Instagram Post : http://bit.do/fcohG

#PakistanNavy Official Channels
Facebook : https://www.facebook.com/pg/PakistanNavy
Twitter : https://twitter.com/PakistanNavy
Instagram : https://www.instagram.com/pakistan_navy
DGPR FB : https://www.facebook.com/pg/DgprNavy
DGPR Twitter : https://twitter.com/dgprPaknavy