DefinePK

DefinePK hosts the largest index of Pakistani journals, research articles, news headlines, and videos. It also offers chapter-level book search.

Pakistan 1st floating solar panel energy power project


Video content is provided via the YouTube platform. All rights and ownership belong to the original content creator.
Source channel: pakvids4u

▶ Watch on YouTube
Description

Pakistan is planning to install first renewable 300 MW floating solar panels power energy project in Ghazi Barotha and Tarbela Dam. The solar energy project will cost $325 million and will be completed within 2 years. The new floating solar power panels project will generate 300 megawatts of cheap electricity will be implemented in the Tarbela and Ghazi Barotha barrages.
The floating Solar panels will be first of its type in Pakistan and it will be placed above water bodies to provide low-cost electricity, making this a one of a kind project conceivable. This renovation will cost $325 million and will take two and a half years to complete.
------------------
✹ Please Subscribe our channel for more videos:
▶ https://www.youtube.com/pakvids4u
--------------

✹ Watch more videos ✹

Mega irrigation project of kachhi canal balochistan Pakistan
https://youtu.be/fkRYlqfESL8

How Many Dams are Being Built in Pakistan
https://youtu.be/kJbOpgFXbqA

Pakistan Renewable Energy and Non Renewable energy Resources
https://youtu.be/_NkP1gJRsJ4
------------------

★ Our social links ★
▶ https://www.facebook.com/pakvids4u
▶ M.Luqman@GamesFun300
------------------------
#solarprojects
#Pakistansolarpanel
#Pakistanenergy
#Pakistansolarpanel
#floatigsolarpanel