2nd Hydel Project under CPEC Suki Kinari Hydropower Dam


Video content is provided via the YouTube platform. All rights and ownership belong to the original content creator.
Source channel: pakvids4u

▶ Watch on YouTube
Description

Suki Kinari hydropower station Dam, is an Pakistan 2nd hydel power project under china Pakistan economic corridor CPEC. Ground-breaking ceremony of the hydropower station project was conducted in March 2017, By the year 2021, 70% of the work on the hydel project has been completed, while operations are expected to be started by December 2022.

------------------
Subscribe My channel:
https://www.youtube.com/pakvids4u
--------------------------

Project Location:
Suki kinari Dam under-construction, run-of-the-river hydropower project located on the Kunhar river in the Kaghan valley of Mansehra District Khyber Pakhtunkhwa.

Project details:
The Suki Kinari hydropower project is one of the biggest private-sector hydropower developments in Pakistan. To be monitored and supported jointly by the governments of Pakistan and China, the project is one of the highest priority early harvest projects within the China-Pakistan Economic Corridor (CPEC).
The dam will be constructed as a 54.5 meter high and 336 meter wide concrete gravity dam with 2 gated spillways. The 3,106m-long reservoir will comprise a 54.5m-tall asphalt concrete rock fill dam featuring flexible concrete cutoff, spillways, power intake system, and other facilities.

Estimated Cost & Financing:
The dam is being developed by Pakistan's SK Hydro group and China's Gezhoba Group. The project achieved financial close on December 31, 2016.The projected cost for the project was initially projected to be $1.314 billion, but as a result of devaluation of the Pakistani Rupee, the cost is now estimated to be $1.8 billion.

Installed Capacity (MW):
Installed generation capacity of 874 MW

Total Jobs Created from this Project:
During the constructions of hydropower station, Project provided nearly 5,000 jobs for local residents in Pakistan

Project Progress:
As of 2021, the project reached 70% completion, and remained on track for inauguration in December 2022.

------------------------

✹ Watch more videos ✹

1ST hydel project under Cpec Completed karot hydropower
https://youtu.be/Z7QeEXPCNZE

All CPEC Phase2 New Projecs Update Details
https://youtu.be/tt6VmX37RKI

Rashakai Economic Zone CPEC ready to Boost Pakistan's economy
https://youtu.be/HT6izATmdYk

Thank you @pakvids4u
--------------------------------
★ Our social links ★
▶ https://www.facebook.com/pakvids4u
▶ M.Luqman@GamesFun300
------------------
#CPECUpdate
#CPECProjects
#PakistanDam
#SukiKinari
#CPECHydropower