DefinePK

DefinePK hosts the largest index of Pakistani journals, research articles, news headlines, and videos. It also offers chapter-level book search.

1ST hydel project under Cpec Completed karot hydropower


Video content is provided via the YouTube platform. All rights and ownership belong to the original content creator.
Source channel: pakvids4u

▶ Watch on YouTube
Description

The first hydel power station (Karot) project under (CPEC) china Pakistan economic corridor has been completed successfully. The Karot hydropower station project has a total installed capacity of 720 megawatts (MW), with the total investment of more than 1.7 billion US dollars. It is being developed by Karot Power Company Limited (KPCL), a special purpose-vehicle in which China Three Gorges South Asia Company Investment (CSAIL) holds a majority share.

-----------------
Please subscribe my channel:
https://www.youtube.com/pakvids4u
@pakvids4u
-----------------------

Project information:
Karot Power station is one of the priority projects of “China-Pakistan Economic Corridor” c-pack. It is also the first hydel project that was included in CPEC. Once functional, it will provide Pakistan with more than 3.2 billion kilowatt-hours of clean energy every year, and it is expected to reduce carbon dioxide emissions by 3.5 million tons per year. While optimizing the energy structure and contributing to the global goal of “Carbon neutrality, it will promote Pakistan’s cheap energy construction, social development and Economy.

Introduction:
The China Pakistan Economic Corridor is a 3,000-kilometer belt and road long route of infrastructure projects connecting northwest China's Xinjiang Uygur Autonomous Region and the Gwadar Port in Pakistan's western Balochistan province.
The first hydropower project along this corridor, the Karot hydropower station, closed the gates of its diversion tunnels after six years of construction and started water storage in its reservoir for future use. The Karot Hydropower Project in Pakistan is one of the major investments under the Belt and Road Initiative. It will start generating electricity in April 2022.

Location:
The dam is located near the villages of Karot, in Punjab, and Hollar, in Azad Jammu and Kashmir (AJK), which is roughly 55km south-east of Islamabad. The dam is expected to be 95.5m-high and 460m-wide across the Jhelum River.
---------------------

✹ Watch more videos ✹

All CPEC Phase2 New Projecs Update Details
https://youtu.be/tt6VmX37RKI

Rashakai Economic Zone CPEC ready to Boost Pakistan's economy
https://youtu.be/HT6izATmdYk

What is Pakistan Special Economic Zon phase2 and its benefits
https://youtu.be/Bx-GeVk21Fg

------------------------------------
★ Disclaimer Note:
• Copyright Disclaimer Under Section 107 of the Copyright Act 1976,allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use. All footage, & images used belong to their respective companies and Owners. If you have any objections, please contact us before taking action against the video. Thanks

E-Mail sahiwal23@gmail.com
------------------
★ Our social links ★
▶ https://www.facebook.com/pakvids4u
▶ M.Luqman@GamesFun300
----------------------
#CPECDam
#Karotdam
#PakistanNewDam