DefinePK

DefinePK hosts the largest index of Pakistani journals, research articles, news headlines, and videos. It also offers chapter-level book search.

Linear Scheduling analysis toolkit for road and airports construction projects


Article Information

Title: Linear Scheduling analysis toolkit for road and airports construction projects

Authors: Francesco Abbondati, Renato Lamberti

Journal: ARPN Journal of Engineering and Applied Sciences

HEC Recognition History
Category From To
Y 2023-07-01 2024-09-30
Y 2022-07-01 2023-06-30
Y 2021-07-01 2022-06-30
X 2020-07-01 2021-06-30

Publisher: Khyber Medical College, Peshawar

Country: Pakistan

Year: 2016

Volume: 11

Issue: 11

Language: English

Categories

Abstract

The Linear Scheduling Method (LSM) is the most effective scheduling tool to use in linear projects. Computer programs have been developed for various scheduling techniques such as Bar Chart, PERT and CPM. There are not many commercially available toolkit for LSM and this lack of toolkit is one of the reasons for its limited usage. The product of this research is a toolkit comprised of models, procedures and tools that allow for implementation of the linear scheduling method. This toolkit is able to calculate the controlling activity path of such schedules, to level the resources of a project scheduled and to print reports of the status of the schedule. The paper describes the toolkit that was developed by the research, its documentation and example for an Italian case study that was scheduled using this prototype.


Paper summary is not available for this article yet.

Loading PDF...

Loading Statistics...